Development Programme

Project Plan or other project management document.

Data Discovery Stage:

Objective:

Identify data sources, understand data requirements, and define the scope of the DataMart project.

Key Activities:

  • Data Source Identification: Identify relevant data sources within the organisation, including databases, applications, and external sources.
  • Data Profiling: Profile data sources to understand data quality, structure, and relationships.
  • Requirements Gathering: Gather business requirements and user needs for the DataMart.
  • Stakeholder Alignment: Align with stakeholders to ensure project objectives and expectations are clear.

Deliverables:

  • Data source inventory
  • Data profiling reports
  • Business requirements document
  • Stakeholder alignment summary[SW1] 

Design Stage:

Objective:

Design the architecture, schema, and data models for the DataMart.

Key Activities:

  • Data Modelling: Design conceptual, logical, and physical data models for the DataMart.
  • Schema Design: Define the schema for tables and relationships within the DataMart.
  • Architecture Design: Determine the technology stack, infrastructure requirements, and integration points for the DataMart.
  • Security and Access Control: Design security measures and access controls to protect data within the DataMart.

Deliverables:

  • Data models (conceptual, logical, physical)
  • Schema diagrams
  • Architecture design document
  • Security and access control specifications

MVP (Minimum Viable Product) Stage:

Objective:

Develop and deploy a minimum viable version of the DataMart with essential features and functionality.

Key Activities:

  • Feature Prioritisation: Identify and prioritise essential features and functionalities based on user needs and business requirements.
  • Prototype Development: Develop prototypes or report mock-ups to visualise and validate the MVP’s key features and user workflows.
  • Development Iteration: Implement the prioritised features and functionalities in an iterative and incremental manner.
  • Testing and Validation: Conduct testing to ensure that the MVP meets user expectations and quality standards.
  • Feedback Collection: Gather feedback from stakeholders and users to iterate on the MVP and refine its features and functionality.
  • Refinement and Optimisation: Iterate on the MVP based on feedback, refining features, improving usability, and optimising performance.

Deliverables:

  • Minimum viable version of the DataMart with essential features implemented
  • Prototypes or Report mock-ups demonstrating key features and workflows
  • Test reports and validation results
  • Stakeholder feedback and iteration log

Deployment Stage:

Objective:

Deploy the DataMart into production, ensuring it is accessible, reliable, and secure.

Key Activities:

  • Environment Setup: Provision infrastructure and environments for development, testing, and production.
  • Data Integration: Extract, transform, and load (ETL) data from source systems into the DataMart.
  • System Configuration: Configure software, databases, and tools required for the DataMart.
  • Testing and Validation: Conduct testing to ensure data accuracy, system performance, and user acceptance.
  • Training and Documentation: Provide training for users and administrators and create documentation for system usage and maintenance.
  • Deployment and Go-Live: Deploy the DataMart into production environment, monitor performance, and address any issues during go-live.

Deliverables:

  • Deployed DataMart system
  • Test reports and validation results.
  • User training materials and documentation
  • Deployment and go-live checklist.

 [SW1]Do we have templates for these?

Leave a Comment